This project will also upgrade the existing non-LED lighting to LED along the same segment. E 15th Avenue Lighting Renovation: This project will install new street lighting to existing poles along E 15 th Avenue between Agate Street and Walnut Street.8th Avenue Streetscape: This project will repave 8th Avenue from Lincoln to Mill Streets, converting the section to a two-way street, constructing protected bike lanes from High to Lincoln Streets, adding 4-way and 2-way stops at key intersections, and widening sidewalks and reconstructing sidewalk access ramps. Eugene's pavement preservation program is funded by local gas taxes and the voter approved 2017 Street Bond Measure. Additional projects elements may include upgrading sidewalk access ramps, adding sidewalks or bike lanes, installing stormwater planters, and more. Pavement preservation projects repave and preserve local streets. These projects focus on making streets safe and reliable for people walking, biking, rolling, busing, and driving. Multimodal transportation projects complete our transportation system, ensuring Eugene’s streets and paths are connected and accessible for community members of all ages and abilities. Projects can include land acquisition, construction, and major preservation of public facilities. Public Works projects preserve or enhance existing City infrastructure - streets, pedestrian and bicycle facilities, wastewater sewers, stormwater facilities, and parks - and provide new and expanded facilities to serve community needs and growth.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |